Approximate list of laboratory works:
- Connection of the electrical lighting line.
- Connection of the socket-line and the lighting line.
- Connection of the socket-line, the lighting line with transfer switches.
The panel includes:
- simulator of house finishing panel, pc. – 1;
- distribution board, pc. – 1;
- single-phase single-pole circuit breaker, pcs. – 6;
- RCD, pcs. – 3;
- distribution box, pcs. – 6;
- electric socket, pcs. – 4;
- incandescent lamp 60 W, pcs. – 4;
- socket with ground and cap, pcs. – 3;
- single-phase waterproof switch, pcs. – 4;
- electric bell, pc. – 1;
- ring button, pc. – 1;
- connecting terminals on DIN-rail, pcs. – 5;
- ground terminals on DIN-rail, pc. – 1;
- corrugated PVC pipe 16mm, m – 10;
- nylon ties for screw 150х3, 60mm, pcs. – 200.
The stand is accompanied by a set of guides and technical documentation for the teaching personnel.