The equipment installed on the mobile platform:
- aluminum heating radiators (3 pcs.);
- balancing valves (2 pcs.);
- pipeline accessories;
- thermostatic regulator;
- three-stage circulation pump;
- electronically controlled circulation pump;
- pressure safety group with expansion tank;
- air valves;
- electric water heater.
On the front of the frame are mounted panels of heat energy flow meters (heat meters) and temperature meters with remote sensors.
The measurement system includes:
- digital thermometers with remote sensors;
- analog thermometers mounted on pipelines;
- electronic and analog flow meters;
- heat meters;
- mounted points for measuring water temperature;
- points for measuring pressure;
- multifunction meters for electrical parameters.
The training system is fully ready for operation, it is possible to connect external heating appliances and additional modules.
The training system is accompanied with:
- a set of teaching materials and technical documentation intended for the teaching staff;
- a software.